Lab / internal
Use a separate IP or port to test the network and integrations before moving to a production domain.
Prepare a clean VPS
WEBO Multisite Server Installer
Set up the web stack and operations tools on Ubuntu through a workflow with checks at every stage.
Discuss deploymentA consistent baseline
From server preflight to network handoff, each deployment has clear steps that can be reviewed.
Confirm resources, root access, domain or IP, database and existing services.
OutcomeConfiguration reviewed
Install the web stack, cache, firewall and cron according to the deployment choices.
OutcomeNetwork foundation ready
Configure WordPress, WEBO Multisite, permissions and SSL for the target environment.
OutcomeNetwork configured
Check services, Redis, cron, backups and administrator access before handoff.
OutcomeOperations tools and handoff details
Target stack
Use a local database or a prepared remote database. The WordPress version can be pinned in the deployment plan.
View server requirementsSSL, UFW and fail2ban are configured for the deployment.
Tools to understand the system's current state and prepare for the next change.
Review RAM, disk, services, network, health and the latest backup with the status tool.
The default schedule checks services, Redis, cron, disk capacity and backups every five minutes. A cooldown limits repeated alerts; email needs a working transport.
Daily backups cover the database, uploads, plugins and themes, with 14 days of local retention. Remote storage through rclone needs separate configuration and a restore test.
WordPress core and installer source updates follow separate processes. The new signed release channel is still a candidate and needs acceptance before release.
Additional networks can use separate hosts or ports. Suitable capacity depends on CPU, RAM, traffic and each site's workload.
Use a separate IP or port to test the network and integrations before moving to a production domain.
Prepare a clean VPS
A clean Ubuntu VPS, a ready domain, and a plan for DNS, SSL, SMTP and backups outside the server.
Agree on configuration and acceptance
Audit the stack, data and rollback path before proposing migration or suitable tools.
Do not run the full installer directly
A server with aaPanel, production WordPress or customer data is not a clean VPS.
These details help WEBO confirm a suitable deployment approach.
Keep a copy outside the server. Local backups do not protect data if the entire VPS is lost.
Change control
The new release channel is still completing signature, checksum and configuration-preservation controls for installer source updates.
Candidate 0.10.1 has not replaced the production channel. Release requires clean-install and update/rollback acceptance.
The installer standardizes a defined stack and related operations tools.
Its scope differs from cPanel, DirectAdmin and aaPanel. Migration, high availability and broader integrations need a separate assessment.
The number of sites a server can run depends on resources and actual load. The plugin license and Server Installer entitlement are confirmed separately.
Learn about WEBO MultisiteDo not run the full installer there. A running server needs an audit and a backup/rollback plan before choosing a suitable approach.
No. A remote MariaDB instance needs a prepared database and user, and must allow connections only from the web server. The installer does not install or tune the remote database server.
The pipeline supports SSL according to its configuration. DNS, integration access and the origin must meet the chosen approach's requirements.
No. By default, backups stay on the VPS for 14 days. Sending them to remote storage requires separate rclone configuration. Test restores regularly.
A tool can add networks on separate hosts or ports. Determine capacity from actual CPU, RAM, traffic and plugins; unlimited capacity is not promised.
WEBO currently handles deployments under review. The package, support scope and entitlement are confirmed after assessing the infrastructure. This page does not offer a self-service download yet.
Controlled deployment intake
Share your current environment, expected number of networks and sites, and deployment needs so WEBO can define the scope with you.
Discuss deployment